| Permit Type |
Permit Fee |
Permit Term |
|
Flammable Storage (MGL Ch 149 Sec. 9) |
$ 40.00 |
1 Year |
|
Propane Tank Installation |
$ 50.00 |
Per Job |
|
Propane Storage |
$ 5.00 |
1 Year |
|
Oil Burner Completions, Inspection and Permit |
$ 25.00 |
Per Job |
|
Storage of Black or Smokeless Powder |
$ 25.00 |
5 Years |
|
Blasting Permit |
$ 100.00 |
Per Job |
|
Removal of Flammable Liquid Tanks |
$ 100.00 |
Per Tank |
|
Installation of Flammable Liquid Tanks |
$ 100.00 |
Per Tank |
|
Fireworks Display |
$ 50.00 |
1 Event |
|
Flammable Decorations, per 527 CMR 21 |
$ 15.00 |
1 Year |
|
Tar Kettle |
$ 50.00 |
Per Job |
|
Tar Truck |
$ 100.00 |
1 Year |
|
Tank Truck Inspections |
$ 75.00 |
2 Years |
|
Copies of Fire or Ambulance Reports |
$ 5.00 |
Per Report |
|
Smoke and Carbon Dioxide Detectors (MGL Ch. 148 Sec. 26 / 527 CMR 21 |
|
|
One Unit |
$ 50.00 |
Per Inspection |
|
Two Unit |
$ 100.00 |
Per Inspection |
|
Three to Six Unit |
$ 150.00 |
Per Inspection |
|
Over Six Units |
$ 500.00 |
Per Inspection |
|
|
|
|
Buildings, as Defined by MGLA c. 148 Sec. 1 |
$ 50.00 |
Per Inspection |
|
Motel and Hotel |
$ 100.00 |
Per Inspection |
|
Theaters |
$ 50.00 |
Per Inspection |
|
Fire Alarm Master Box Connection |
$ 250.00 |
1 Year |
|
Central Office and Other Signal to Fire Alarm |
$ 125.00 |
1 Year |